Stage rigging system for a new theatre restaurant constructed on the top floor of a hotel building, which is itself located at the peak of an 1800m high mountain. The rigging system includes single and double purchase counterweight sets, 25 fixed speed pile wind winches, Triple E curtain tracks, twin concentric stage revolve using customised Stage Technologies Revolution drives, a small chain drive effects elevator and customised controls. Work carried out under contract to Sum Poh Snd and valued at £600,000.