Kings School Concert Hall and Drama Studios – 2019
Glantre were appointed by main contractor Speller Metcalfe to provide audio visual, lighting, and overheard rigging to a concert/presentation hall and two drama studios. Audiovisual and stage lighting infrastructure was installed to the main hall with automated control systems for ease of use by staff.
Studio 1 incorporates an overhead truss suspended on four chain hoists with installed audiovisual & lighting infrastucture and associated cable management. A perimeter curtain track was installed, along with drapes.
In Studio 2 Glantre proivded a pipe grid and lighting / audiovisual cable infrastructure for use with the school’s existing AV, Lighting equipment and drapes.